-;;; We insert a call to a funny function in a new cleanup block introduced
-;;; between Block1 and Block2. Since control analysis and LTN have already
-;;; run, we must do make an IR2 block, then do ADD-TO-EMIT-ORDER and
-;;; LTN-ANALYZE-BLOCK on the new block. The new block is inserted after Block1
-;;; in the emit order.
+;;; We insert a call to a funny function in a new cleanup block
+;;; introduced between BLOCK1 and BLOCK2. Since control analysis and
+;;; LTN have already run, we must do make an IR2 block, then do
+;;; ADD-TO-EMIT-ORDER and LTN-ANALYZE-BELATED-BLOCK on the new block.
+;;; The new block is inserted after BLOCK1 in the emit order.